• Home
  • Dock Products
  • Details
  • Dock Testimonials
  • FAQS
  • About Us
  • Contact
Breina Docks – Aluminum Docks Cedar Decks Breina Docks – Aluminum Docks Cedar Decks Breina Docks – Aluminum Docks Cedar Decks
  • Home
  • Dock Products
  • Details
  • Dock Testimonials
  • FAQS
  • About Us
  • Contact

Faqs

Home / Faqs
0
By Brent Fagnou
In
Posted September 2, 2017

Does my dock need to be tied down?

Inherently, any aluminium dock is more apt to damage in adverse weather conditions simply because of it’s lighter weight. Whether or not the dock should be fastened down is entirely up to [...]

READ MORE
0
By Brent Fagnou
In
Posted September 2, 2017

Can I add additional frame sections to my existing dock at some point in the future?

Yes!  “Extension” sections can be added at any time to lengthen a dock. Also, some will add an “L” section at dock’s end to provide a mooring section parallel to [...]

READ MORE
0
By yasadmin
In
Posted August 24, 2015

How stable are our docks?

The five foot width, along with 2” X 2” sq. legs offer excellent stability.

READ MORE
0
By yasadmin
In
Posted August 24, 2015

Does the decking require staining?

Although most do not stain their Cedar decking, it can be done, it’s completely up to the buyer. The red cedar color will fade to grey over time. Cedar however, is very resistant to rot, [...]

READ MORE
0
By yasadmin
In
Posted August 24, 2015

Is there any warranty?

Yes, lifetime warranty against manufactures defects. Failures due to nature (ice, wind, waves, etc) are not covered.

READ MORE
0
By yasadmin
In
Posted August 24, 2015

How much do they weigh?

A 5 x 10 foot frame weighs 60 pounds. With each 5 x 5 foot Western Red Cedar decking panel weighing 50 lbs.

READ MORE
0
By yasadmin
In
Posted August 24, 2015

How easy are they to adjust?

A simple friction fit via two, ½” inch bolts on each leg are all that’s necessary to achieve and maintain the desired height.

READ MORE
0
By yasadmin
In
Posted August 24, 2015

How long does it take to install a Breina Docks dock system?

Depends on the size and configuration. Usually one – two hours. This should be enough time for two people to assemble a forty foot package for the first time.

READ MORE
Contact Us
  • Box 158 St.Brieux SK
    S0K 3V0
  • Office: (306) 752 - 2410
  • Cell: (306) 921 - 3651
  • info@breinadocks.ca
Breina Docks Copyright 2022 - Website by Yas